Image coming soon

Industrial Control System Toolkit

USD191.99
Availability:
Downloadable Resources, Instant Access
Adding to cart… The item has been added

Confirm your organization performs SCADA user accountManagement FunctionswithActive Directoryand coordinates with otherNetwork Managersand security supervisor to ensure plans and designs follow industry recommended standards for implementation of an IndustrialControl System(ICS).

More Uses of the IndustrialControl SystemToolkit:

 

Direct Industrial Control System: work is expected to result in significant contributions to the development of new or refined equipment, materials, processes, products, and/or methods.

More Uses of the Industrial Control System Toolkit:

 

Save time, empower your teams and effectively upgrade your processes with access to this practical Industrial Control System Toolkit and guide. Address common challenges with best-practice templates, step-by-step Work Plans and maturity diagnostics for any Industrial Control System related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Industrial Control System specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Industrial Control System Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a Data Driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 999 new and updated case-based questions, organized into seven core areas of Process Design, this Self-Assessment will help you identify areas in which Industrial Control System improvements can be made.

Examples; 10 of the 999 standard requirements:

  1. How do you engage the workforce, in addition to satisfying them?

  2. Are resources adequate for the scope?

  3. Is the required Industrial Control System data gathered?

  4. If you weren't already in this business, would you enter it today? And if not, what are you going to do about it?

  5. What actually has to improve and by how much?

  6. What are your primary costs, revenues, assets?

  7. How do controls support value?

  8. Can you add value to the current Industrial Control System decision-making process (largely qualitative) by incorporating uncertainty modeling (more quantitative)?

  9. What are theStrategic Prioritiesfor this year?

  10. Are the assumptions believable and achievable?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Industrial Control System book in PDF containing 994 requirements, which criteria correspond to the criteria in...

Your Industrial Control System self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Industrial Control System Self-Assessment and Scorecard you will develop a clear picture of which Industrial Control System areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Industrial Control System Self-Assessment
    • Is secure: Ensures offline Data Protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Industrial Control System projects with the 62 implementation resources:

Examples; 10 of the check box criteria:

  1. Cost Management Plan: Eac -estimate at completion, what is the total job expected to cost?

  2. Activity Cost Estimates: In which phase of the Acquisition Process cycle does source qualifications reside?

  3. Project Scope Statement: Will all Industrial Control System project issues be unconditionally tracked through the Issue Resolution process?

  4. Closing Process Group: Did the Industrial Control System Project Team have enough people to execute the Industrial Control System Project Plan?

  5. Source Selection Criteria: What are the guidelines regarding award without considerations?

  6. Scope Management Plan: Are Corrective Actions taken when actual results are substantially different from detailed Industrial Control System Project Plan (variances)?

  7. Initiating Process Group: During which stage of Risk planning are risks prioritized based on probability and impact?

  8. Cost Management Plan: Is your organization certified as a supplier, wholesaler, regular dealer, or manufacturer of corresponding products/supplies?

  9. Procurement Audit: Was a formal review of tenders received undertaken?

  10. Activity Cost Estimates: What procedures are put in place regarding bidding and cost comparisons, if any?

 
Step-by-step and complete Industrial Control System Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:


2.0 Planning Process Group:


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8Team PerformanceAssessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Industrial Control System project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Industrial Control System project or Phase Close-Out<